Hauptseite: Unterschied zwischen den Versionen

Aus Planungskompendium Energieverteilung
Wechseln zu:Navigation, Suche
Keine Bearbeitungszusammenfassung
(creation)
Zeile 1: Zeile 1:
<metadesc>Das Planungskompendium Energieverteilung ist jetzt als Wiki verfügbar. Unterstützung bei der normgerechten Ausführung von Elektroinstallationen, z. B. nach IEC 60364 (VDE 0100 ff). Zur Verfügung gestellt von Schneider Electric.</metadesc>
__NOTOC__
__NOTOC__
__NOEDITSECTION__
__NOEDITSECTION__
<!-------------------------------------------------------------
                        ENTÊTE DE BIENVENUE
-------------------------------------------------------------->
{| id="mp-topbanner" class="table_noCSS" style="width:100%; background:#fcfcfc; margin-top:-30px; border:1px solid #ccc;"
| style="width:56%; color:#000;" |
{| class="table_noCSS" style="width:280px; border:none; background:none;"
| style="width:280px; text-align:left; white-space:nowrap; color:#000;" |
<div style="font-size:162%; border:none; margin:0; padding:.1em;
color:#000;"><div style="color:#f00;">PRE-PROD environment</div>Welcome to GERMAN WIKI</div>
|}
|}
<!-------------------------------------------------------------
                        LIGNE EN DESSOUS DE L'ENTÊTE
-------------------------------------------------------------->
<!-------------------------------------------------------------
<!-------------------------------------------------------------
                         SUMMARY
                         SUMMARY
-------------------------------------------------------------->
-------------------------------------------------------------->
{| id="mp-left" style="width:100%; vertical-align:top; background:#f5fffa;"
{| class="table_noCSS" id="mp-upper" style="margin:0; background:none; margin-top:8px;"
|-
| class="MainPageBG" valign="top" |
! style="padding:2px" | <h2 id="mp-dyk-h2" style="margin:3px;
<div id="mp-dyk">
background:#cef2e0; font-size:120%; font-weight:bold; border:1px solid #a3bfb1; text-align:left; color:#000; padding:0.2em 0.4em;">Summary</h2>
 
|-
<!---------- banner ------------->
| style="color:#000;padding:2px 5px 5px" | <div id="mp-dyk">
<slideshow sequence="forward" transition="fade" refresh="10000">
<div class="slide_items">[[File:Slider_Lightning.jpg|center|750px|link=Overvoltage protection|alt=]]</div>
<div class="slide_items">[[File:Slider_Photovoltaic.jpg||center|750px|link=PhotoVoltaic (PV) installation|alt=]]</div>
<div class="slide_items">[[File:Slider_EMC.jpg|center|750px|link=ElectroMagnetic Compatibility (EMC)|alt=]]</div>
</slideshow>
 
= Planungskompendium Energieverteilung im Wiki-Format! =
 
"Das Planungskompendium Energieverteilung ist nun auch hier als Wiki (Elektroinstallations-Wiki) verfügbar. Das Wiki ist eine gemeinschaftliche Plattform und wird von Schneider Electric zur Verfügung gestellt. Unsere Experten verbessern kontinuierlich den Inhalt, genauso wie beim gedruckten Planungskompendium. Der Unterschied, beim Wiki kann jeder mitwirken.
 
Das Ziel des Planungskompendiums Energieverteilung (und jetzt des Wiki) ist die Unterstützung von Elektrofachkräften und Elektroingenieuren bei der Errichtung und Instandhaltung elektrischer Anlagen und Betriebsmittel nach Normen wie IEC 60364 (VDE0100 ff) und anderen wichtigen Normen.
 
Unten finden Sie das Gesamtinhaltsverzeichnis dieses Wiki, mit Links zu allen Kapiteln und Themen (wie auch im Planungskompendium Energieverteilung)."




{| class="wikitable"
{| class="table_noCSS" cellspacing="15"
|-
| A ||  [[Allgemeine Planungsgrundlagen – Bestimmungen – Installierte Leistung]] || [[Talk:Allgemeine Planungsgrundlagen – Bestimmungen – Installierte Leistung|Talk page]] ||
|-
| B ||  [[Anschluss an das Hochspannungs-Versorgungsnetz des Netzbetreibers]] || [[Talk:Anschluss an das Hochspannungs-Versorgungsnetz des Netzbetreibers|Talk page]]
|-
| C ||  [[Anschluss an das NS-Verteilnetz des Netzbetreibers]] || [[Talk:Anschluss an das NS-Verteilnetz des Netzbetreibers|Talk page]]
|-
| D ||  [[Auswahlhilfe HS- und NS-Verteilnetzarchitektur]] || [[Talk:Auswahlhilfe HS- und NS-Verteilnetzarchitektur|Talk page]]
|-
| E ||  [[Verteilsysteme in NS-Verteilnetzen]] || [[Talk:Verteilsysteme in NS-Verteilnetzen|Talk page]] || '''CHAPTER DONE'''  (including images)]]
|-
| F ||  [[Schutz gegen elektrischen Schlag]] || [[Talk:Schutz gegen elektrischen Schlag|Talk page]]
|-
| G ||  [[Schutz von Stromkreisen]] || [[Talk:Schutz von Stromkreisen|Talk page]]
|-
| H ||  [[Schaltgeräte]] || [[Talk:Schaltgeräte|Talk page]]
|-
| J ||  [[Schutz bei Überspannungen und Stoßüberspannungen]] || [[Talk:Schutz bei Überspannungen und Stoßüberspannungen|Talk page]] ||
|-
| K ||  [[Energieeffizienz in elektrischen Verteilnetzen]] || [[Talk:Energieeffizienz in elektrischen Verteilnetzen|Talk page]]
|-
| L ||  [[Blindleistungskompensation und Filterung von Oberschwingungen]] || [[Talk:Blindleistungskompensation und Filterung von Oberschwingungen|Talk page]]
|-
| M ||  [[Oberschwingungserfassung und - filterung]] || [[Talk:Oberschwingungserfassung und - filterung|Talk page]]
|-
| N ||  [[Stromversorgungen und Verbraucher besonderer Art]] || [[Talk:Stromversorgungen und Verbraucher besonderer Art|Talk page]]
|-
| P ||  [[Solaranlagen]] || [[Talk:Solaranlagen|Talk page]] ||
|-
| Q ||  [[Wohngebäude und ähnliche Einsatzbereiche sowie besondere Orte und Bereiche]] || [[Talk:Wohngebäude und ähnliche Einsatzbereiche sowie besondere Orte und Bereiche|Talk page]] ||
|-
| R ||  [[EMV-Richtlinien]] || [[Talk:EMV-Richtlinien|Talk page]]
|-
|-
|  | [[File:standards.png|link=|alt=]]
| width="300px" colspan="3"|{{Htoc_link|[[Electrical installation rules, standards|<span title="This section introduces the roles of standards and regulations, provides a list of the relevant IEC standards for electrical installation, provides details on standardized voltage ranges, on quality and safety of electrical installations etc ...">Electrical installation regulations and standards</span>]]}}
{{Htoc_link|[[Electrical installation design methodology|<span title="Here you will find guidelines on the different steps of electrical installation design methodology, with links to the related articles or sections where all the detailed technical contents are available">Design Methodology</span>]]}}
<br>
|- style="padding-bottom:15px"
|  | [[File:load.png|link=|alt=]]
| width="300px" colspan="1"|
{{Htoc_title|10px|Power demand of the electrical installation}}
{{Htoc_link|[[Installed power loads - Characteristics|<span title="This section explains how to take into account the actual values of apparent-power required by different types of loads, like resistive loads, motors, fluorescent or discharge lamps">Installed power loads</span>]]}}
{{Htoc_link|[[Power loading of an installation|<span title="The aim of this chapter is to show how to assess the actual maximum load demand likely to be imposed on the power-supply system, taking into account factors like the diversity (non simultaneous operation of all appliances of a given group) and utilization (e.g. an electric motor is generally not operated at its full-load capability, etc.) of all existing and projected loads.">Power demand of the electrical installation</span>]]}}
|  | [[File:energy-efficiency.png|link=|alt=]]
| width="300px" colspan="1"|
{{Htoc_title|10px|[[Energy Efficiency in electrical distribution|<span title="Power monitoring and control system contributes to global Energy Efficiency. Such a system is of high benefit for the owner of an electrical network.">Energy Efficiency in electrical installation</span>]]}}
|- style="padding-bottom:15px"
|  | [[File:grid.png|link=|alt=]]
| width="300px" colspan="1"|
{{Htoc_title|10px|Connection to the utility distribution network}}
{{Htoc_link|[[Connection to the MV utility distribution network|<span title="This chapter presents the main methods of connection to the MV utility distribution network.">Medium Voltage (MV)</span>]]}}
{{Htoc_link|[[Connection to the LV utility distribution network|<span title="This chapter presents the main methods of connection to the LV utility distribution network.">Low Voltage (LV)</span>]]}}
|  | [[File:power-factor.png|link=|alt=]]
| width="300px" colspan="1"|
{{Htoc_title|20px|[[Power Factor Correction|<span title="This chapter explains how power factor correction is implemented in LV electrical installation. Practical examples are given.">Power Factor correction</span>]]}}
|- style="padding-bottom:15px"
|  | [[File:architecture.png|link=|alt=]]
| width="300px" colspan="1"|
{{Htoc_title|20px|Architecture selection}}
{{Htoc_link|[[MV and LV architecture selection guide|<span title="Given a particular building, we show how to select the right solution during pre-design and budget step: find a compromise between costs and ratings of the installation during its whole life cycle.">Architecture selection guide</span>]]}}
{{Htoc_link|[[LV Distribution|<span title="Design rules of an electrical installation. Earthing Systems.">LV Distribution</span>]]}}
|  | [[File:harmonics.png|link=|alt=]]
| width="300px" colspan="1"|
{{Htoc_title|20px|[[Power harmonics management|<span title="The origin and effects of harmonics are described. Measurement and filtering methods are proposed.">Power harmonics management</span>]]}}
|- style="padding-bottom:15px"
|  | [[File:safety.png|link=|alt=]]
| width="300px" colspan="1"|
{{Htoc_title|10px|Protection against electrical hazards}}
{{Htoc_link|[[Protection against electric shocks|<span title="This chapter explains how to determine protective devices in order to protect people from direct & indirect contacts and to protect equipments and goods from fire risks.">Protection against electric shocks</span>]]}}
{{Htoc_link|[[Overvoltage protection|<span title="The effects of lightning are described. Surge Protective devices are proposed and implementation rules are given.">Protection against overvoltage</span>]]}}
|  | [[File:EMC.png|link=|alt=]]
| width="300px" colspan="1"|
{{Htoc_title|20px|[[ElectroMagnetic Compatibility (EMC)|<span title="This chapter describes the basic rules for ensuring EMC: earthing principles, cable lay-out, wiring recommendations.">ElectroMagnetic Compatibility</span>]]}}
|- style="padding-bottom:15px"
|  | [[File:circuit.png|link=|alt=]]
| width="300px" colspan="1"|
{{Htoc_title|20px|Circuit and switchgears}}
{{Htoc_link|[[Sizing and protection of conductors|<span title="Practical methods for conductor sizing and protection are given.">Sizing and protection of conductors</span>]]}}
{{Htoc_link|[[LV switchgear: functions and selection|<span title="The basic functions of LV switchgear are described, as well as the selection rules for ensuring the protection coordination">LV switchgear: function and selection</span>]]}}
|  | [[File:pv.png|link=|alt=]]
| width="300px" colspan="1"|
{{Htoc_title|5px|Recommandations for specific loads, sources, installations and locations}}
{{Htoc_link|[[Characteristics of particular sources and loads|<span title="Specific sources and loads are studied: generators, inverters, induction motors, lighting circuits, LV/LV transformers...">Characteristics of particular sources and loads</span>]]}}
{{Htoc_link|[[PhotoVoltaic (PV) installation|<span title="PhotoVoltaic (PV) installation">Photovoltaic installations</span>]]}}
{{Htoc_link|[[Residential and other special locations|<span title="The specific intallations rules applicable to residential premises and some other locations are presented.">Residential and other special locations</span>]]}}
|}
|}




</div>
</div>
| style="border:1px solid transparent;padding-right:10px" |
<!-------------------------------------------------------------
                        BLOGS  &  DOWNLOAD
-------------------------------------------------------------->
| class="MainPageBG" style="width:258px;" valign="top" |
<div id="mp-itn">{{blogs}}
<div id="mp-itn" style="margin-top:15px;">{{Electrical_Installation_Guide}}
|}
|}


[[Category:Chapter - Homepage]]
[[Category:Chapter - Hauptseite]]
 
[[en:Main_Page]]
[[en:Main_Page]]

Version vom 7. Februar 2014, 14:02 Uhr


<slideshow sequence="forward" transition="fade" refresh="10000">

</slideshow>

Planungskompendium Energieverteilung im Wiki-Format!

"Das Planungskompendium Energieverteilung ist nun auch hier als Wiki (Elektroinstallations-Wiki) verfügbar. Das Wiki ist eine gemeinschaftliche Plattform und wird von Schneider Electric zur Verfügung gestellt. Unsere Experten verbessern kontinuierlich den Inhalt, genauso wie beim gedruckten Planungskompendium. Der Unterschied, beim Wiki kann jeder mitwirken.

Das Ziel des Planungskompendiums Energieverteilung (und jetzt des Wiki) ist die Unterstützung von Elektrofachkräften und Elektroingenieuren bei der Errichtung und Instandhaltung elektrischer Anlagen und Betriebsmittel nach Normen wie IEC 60364 (VDE0100 ff) und anderen wichtigen Normen.

Unten finden Sie das Gesamtinhaltsverzeichnis dieses Wiki, mit Links zu allen Kapiteln und Themen (wie auch im Planungskompendium Energieverteilung)."


Electrical installation regulations and standards


Design Methodology



Power demand of the electrical installation

Installed power loads


Power demand of the electrical installation


Energy Efficiency in electrical installation

Connection to the utility distribution network

Medium Voltage (MV)


Low Voltage (LV)


Power Factor correction

Architecture selection

Architecture selection guide


LV Distribution


Power harmonics management

Protection against electrical hazards

Protection against electric shocks


Protection against overvoltage


ElectroMagnetic Compatibility

Circuit and switchgears

Sizing and protection of conductors


LV switchgear: function and selection


Recommandations for specific loads, sources, installations and locations

Characteristics of particular sources and loads


Photovoltaic installations


Residential and other special locations



Blogs icon.png
Latest Blog Posts

Der RSS-Feed von https://blog.schneider-electric.com/power-management-metering-monitoring-power-quality/feed/ konnte nicht geladen werden: Fehler beim Parsen von XML für RSS

Electrical Installation Guide
Electrical Installation Guide 2016.png

Neue Ausgabe des Electrical Installation Guide 2016

Teilen